Triveni Link Canal HEP (2x1.5 MW)

 

 

 

 

 
line decor
  
line decor

Salient features

 

The Gandak Canal is one of the oldest canal systems in the country and the modified canal system is in operation since 1968-69.

The existing fall at RD 6.7 of Tirhut Main Canal & drop available at the head regulator of Triveni Canal off taking at RD. 9.5 of T.M.C. is proposed to be combined to generate 3.0 MW of Power in a Power House located at the by pass power channel.

Location :  Block Bagaha, Distt,- West Champaran.

 

1.         Catchment area at Gandak site           :           37,410 sq. kms.

2.         Water Conductor System                    

            (a)        Power Channel                        :           235 Meters
            (b)        Tail race Channel                    :           730 meters

3.         Power House

            (a)        Installed capacity                     :           2x1.5 MW
            (b)        Design Head                            :           4.49 M.
            (c)        Design Discharge                    :           70.85 Cumecs.
            (d)        Annual Energy Generation      :           14.94 MU

4.         Turbine (s)                                           :           2x1500 KW, 750 rpm.,Horizontal Shaft, Tubular-‘S’ Type full Kaplan.

5.         Generator (s)                                       :           Brushless Synchronous Horizontal                                                                                            type Generator 1500 KW, 50Mz.,                                                                                     750 rpm, Voltage – 3.3 kV.

 

 

***